Derbyshire
Looking for shopfronts and roller shutters in Ilkeston? Free survey, fixed written price, no pressure to proceed.
Same working day response, usually.
In Ilkeston
Powder-coated aluminium shopfronts made to measure
from £2,450Frameless structural glass for a premium frontage
from £4,200Traditional and conservation-area timber frontages
from £3,800Heavy-duty steel frontages for high-risk locations
from £3,600Fully opening frontages for cafes, bars and restaurants
from £5,200Sensor-operated entrance doors, DDA compliant
from £3,900Motorised shutters with remote and key-switch control
from £1,450Frame, hinge, closer and glazing bead repairs
from £165Nothing is ordered until you have a written price and have agreed it. The survey costs you nothing and carries no obligation — plenty of people use it simply to find out what the job would involve before they budget for it.
Every job starts with a site survey, because a frontage measured off a photograph is a frontage that arrives wrong. We take the opening dimensions, check the lintel and the floor level, and confirm what the existing structure will carry before anything is ordered.
Tell us the address and roughly what you need and a surveyor will come out at a time that suits the business.
For a like-for-like replacement, usually not. You will need consent for a listed building, in a conservation area, or where you change the appearance of the frontage or add illuminated signage. We can tell you which applies at survey, though the application itself is between you and the council.
Yes. Overnight and closed-day installation is normal for units that cannot lose a trading day, and the premises are left secure at every stage of the work.
Yes. Shopfront glass must be toughened or laminated and kitemarked in a critical location, so panes are ordered to the surveyed size — which means a same-day swap is rarely possible on anything large. Boarding secures the opening in the meantime.
Any RAL colour on aluminium and steel. Anthracite grey (RAL 7016) and black (RAL 9005) are the most common on high-street units, but the powder coater will match whatever your brand standard specifies.
On a parade where the landlord requires a consistent frontage, we work from the same section profiles and colour reference so the new unit reads as part of the row.
What happens next
A rough description and a photo of the frontage is enough to start with.
Survey takes around half an hour. We check the opening, the lintel and how we would get the units in.
Itemised so you can see what each part costs, and held for 30 days.
Date agreed with you, work done around trading, site left clean and the paperwork handed over.
Free survey across Ilkeston, a fixed written price, and no obligation to go ahead.
Book a free surveyCall 0800 088 6248