Lincolnshire
Shopfronts and roller shutters across Boston, surveyed and installed by tradespeople who fit them every week.
Same working day response, usually.
In Boston
Powder-coated aluminium shopfronts made to measure
from £2,450Frameless structural glass for a premium frontage
from £4,200Traditional and conservation-area timber frontages
from £3,800Heavy-duty steel frontages for high-risk locations
from £3,600Fully opening frontages for cafes, bars and restaurants
from £5,200Sensor-operated entrance doors, DDA compliant
from £3,900Motorised shutters with remote and key-switch control
from £1,450Frame, hinge, closer and glazing bead repairs
from £165Nothing is ordered until you have a written price and have agreed it. The survey costs you nothing and carries no obligation — plenty of people use it simply to find out what the job would involve before they budget for it.
Nothing is ordered until you have a written price and have agreed it. The survey costs you nothing and carries no obligation — plenty of people use it simply to find out what the job would involve before they budget for it.
Tell us the address and roughly what you need and a surveyor will come out at a time that suits the business.
Installation is guaranteed for 12 months. Manufacturer warranties on hardware, motors and powder coating run longer and are passed to you in writing on completion.
Yes, and there is no obligation attached to it. A number of people book one purely to get a realistic figure before they commit to a lease or set a refurbishment budget.
Usually yes, provided the lintel will take the load and there is headroom for the barrel. That is one of the first things checked at survey.
It depends on the opening width, the material and whether the existing frontage needs stripping out. As a guide, an aluminium frontage on a standard single unit usually starts around £2,450 plus VAT. The survey gives you a fixed written figure rather than a range.
A straightforward shopfront is one to two days on site once manufactured. Manufacturing is typically three to four weeks from the point you approve the drawings. Shutters alone are usually a single day.
What happens next
A rough description and a photo of the frontage is enough to start with.
Survey takes around half an hour. We check the opening, the lintel and how we would get the units in.
Itemised so you can see what each part costs, and held for 30 days.
Date agreed with you, work done around trading, site left clean and the paperwork handed over.
Free survey across Boston, a fixed written price, and no obligation to go ahead.
Book a free surveyCall 0800 088 6248